Client
|
Description of Project
|
Results
|
Start to Finish
|
| Belron Canada Ltd. |
In the beginning of 1999, Belron Canada Inc. hired one of the largest
consulting firms in the world to plan and implement a Business Continuity
Plan in the event of Y2K related problems.
Brodem was requested to facilitate the design and manage the implementation
of the project after eight months of unsatisfactory results.
Project Leader: Bob Brothers
|
Brodem's unique process driven approach helped the management team
workshop create a comprehensive plan within an eight hour working
day.
The design proved quick and easy to implement. Parts of it were
adapted by Belron's head office in the UK for deployment world wide.
|
Design 1 day
Implementation 5 weeks
|
| Hydro Quebec Information Management |
The Hydro Quebec purchasing department assembled a multi-disciplinary
team to solve data reporting problems caused by the implementation
of a new Enterprise Resource Planning (ERP) computer system. Brodem's
role was to:
- Identify, document and analyze the purchasing processes affecting
data.
- Create the overall Quality Plan for the project.
- Create and implement a statistically based quality assurance
program to detect, correct and control data errors.
- Facilitate corrective actions for the team.
- Create and improve the team's procedures to use for the next
Hydro Quebec information management project.
Project Leader: Susie St-Onge
|
The project team met an in some cases exceeded the original mandate.
The customized approach developed by Brodem was essential to the
project. As well, the experience gained served as the pilot project
for Brodem's Information Technology Optimization
product.
|
Brodem contribution 4 weeks |
| Hydro Quebec Project Material and Transportation Services |
This unit of Hydro Quebec evaluated serveral approaches for implementing
ISO 9000. Brodem was chosen because of its unique process driven
approach.
Project Leader: Bob Brothers
|
Apart from achieving registration on time, this was the first Hydro
Quebec service unit to achieve ISO 9001:1994 |
Implementation 24 weeks |
| Hydro Quebec Transportation Services |
The Transportation Services division purchases and maintains Hydro
Quebec's 8500 vehicles. The recent implementation of an ERP system
forced them to change their processes in order to adapt. The result
was a 70% decrease in productivity and the loss of millions of dollars.
Brodem was asked to propose a way of correcting the situation.
Project Leader: Susie St-Onge
|
After documenting the processes and gathering data, Brodem facilitated
a cross functional team using our Information Technology Optimization
approach.
The result was:
- a restructuring of authority and responsibilities
- an elimination of non-value added steps in the ERP system
- the re-design of parts inventory, procurement and control
- a detailed implementation plan
- buy-in from management and the unionized employees
- 100% of the financial goals achieved within 4 weeks
|
Gather info 24 days
Design 8 days
|
| Hydro Quebec Professional Services |
The design and build of two small hydroelectric generating stations
was given 100% to the private sector for the first time in Hydro
Quebec's history. The goal was to reduce the cost and completion
time while maintaining the Hydro Quebec standards.
Brodem was hired to conduct the "post-mortem" which was
the first of its kind.
Project Leader: Bob Brothers
|
The post-mortem was conducted on the two projects using re-design
techniques, ISO 9001:1994, ISO 10006 and internal HQ criteria. The
results were:
- A customized methodology for future post-mortems
- Identification of opportunities for improvement
- Recommendations for future projects
|
Gather info Analyze Report 4 weeks |
| Wingrill Limited |
The design and implementation of a Lean Production System to increase
productivity and optimize the layout of the plant.
Project Leader: Bob Brothers
|
- 100% increase in production throughput
- 75% reduction of work in process
- 400% increase in available space
- a simplified scheduling system
- real-time production status
- no capital investment
- optimized plant layout
- ... many more benefits
|
Gather info 7 days
Design 6 days
|